Blog

Reality Capture at Scale: Proven Progress Tracking Guide 

Introduction Does your construction progress reporting rest on facts or assumptions? Reality capture will get rid of assumptions.  In many construction sites, progress reports are still generated using assumptions of the subcontractor, pictures from past times, and informal discussions held in the hallways. The subcontractor will say that the job…
federal proposal management

Federal Proposal Management: How to Build a Winning Proposal Team

Federal Proposal Management: How to Build a Proposal Team That Actually Wins An RFP drops, and suddenly everyone is moving.  The Proposal Manager is chasing SME inputs. The technical team is interpreting requirements. Contracts has questions about the solicitation. Pricing needs staffing assumptions. Writers are waiting for content, while leadership wants to…
Traffic Impact Analysis

Traffic Impact Analysis in Smart Cities: Complete 2026 Guide

Introduction Are you still using obsolete traffic impact analyses that cannot cope with fast changes in the world of smart cities? Transportation engineers were for decades relying on traditional manual counting and modeling tools when predicting the effect on the existing streets of building new developments. But now that smart…
Mass Timber Construction

Mass Timber Construction: Engineering Sustainable Mid-Rises

Introduction Timber construction is not merely some experimental technique; it is revolutionizing the way that mid-rise structures are constructed in North America. Is it really possible for a pile of wooden panels to support a seven-story structure above an urban street and withstand fires and earthquakes?  That question sits at…
Federal Proposal Volumes

Federal Proposal Volumes: What Goes Into Each One? 

Federal Proposal Volumes: What Goes Into Each One? You open an RFP expecting to plan a proposal response. Then you reach the submission instructions and find five separate volumes, each with its own page limits, content requirements, and formatting rules.  Technical. Management. Past Performance. Staffing. Price.  The challenge isn’t just developing good content. It’s knowing what…
SBA Size Standards Could Redefine Federal Contracting Competition

SBA Size Standards Could Redefine Federal Contracting Competition 

SBA Redefines a “Small Business Size Standard” – What Federal Contractors Need to Know More than 114,000 additional businesses could qualify as small under the SBA’s proposed overhaul of federal size standards.  For growing government contractors, that may sound like good news. A higher threshold could mean more room to grow before…
solar

Utility-Scale Solar Tracker Design: Expert Guide

Introduction Utility-scale solar tracker design is becoming increasingly important as the clean energy industry expands but how do engineers ensure that thousands of moving solar panels can withstand wind, soil, and long-term structural demands?  A utility solar farm is not just an area covered by photovoltaic panels. There is also…
Drafting Outsourcing Companies

Drafting Outsourcing Companies: Scale AEC Teams Fast

Introduction Why do so many architecture and engineering firms now rely on drafting outsourcing companies instead of hiring their way out of a backlog?  The honest answer is capacity.  AEC firms need experienced technical professionals, but hiring does not always move at the same speed as project demand. The U.S.…
Prev
Next
Drag
Map